Nigeria Energy Sector
Collection
A collection of datasets across Nigeria's energy sector.
•
35 items
•
Updated
•
8
wo_id
stringlengths 12
12
| disco
stringclasses 10
values | substation_id
stringclasses 23
values | category
stringclasses 2
values | created_time
stringdate 2024-01-01 00:11:38
2024-12-30 23:58:21
| planned_start
stringdate 2024-01-01 00:55:49
2025-01-13 19:10:02
| planned_end
stringdate 2024-01-01 00:55:49
2025-01-19 02:10:43
| status
stringclasses 5
values | estimated_cost_ngn
float64 200k
32.9M
| assigned_team
stringlengths 9
9
|
|---|---|---|---|---|---|---|---|---|---|
WO-000000000
|
Kaduna
|
KAD-SS-002
|
planned
|
2024-02-05 08:27:07
|
2024-02-12 08:27:07
|
2024-02-16 08:27:07
|
in_progress
| 3,549,301 |
TEAM-0000
|
WO-000000001
|
Enugu
|
ENG-SS-001
|
planned
|
2024-12-22 12:52:14
|
2025-01-02 12:52:14
|
2025-01-03 12:52:14
|
on_hold
| 6,611,601 |
TEAM-0001
|
WO-000000002
|
Abuja
|
ABJ-SS-002
|
planned
|
2024-08-28 05:40:59
|
2024-09-01 05:40:59
|
2024-09-04 05:40:59
|
cancelled
| 2,060,159 |
TEAM-0002
|
WO-000000003
|
Ibadan
|
IBD-SS-001
|
unplanned
|
2024-02-18 00:40:50
|
2024-02-18 00:40:50
|
2024-02-18 00:40:50
|
in_progress
| 2,162,083 |
TEAM-0003
|
WO-000000004
|
Enugu
|
ENG-SS-002
|
planned
|
2024-02-22 01:53:19
|
2024-03-01 01:53:19
|
2024-03-03 01:53:19
|
on_hold
| 2,421,303 |
TEAM-0004
|
WO-000000005
|
Jos
|
JOS-SS-001
|
unplanned
|
2024-11-09 00:38:16
|
2024-11-13 00:38:16
|
2024-11-13 00:38:16
|
open
| 865,215 |
TEAM-0005
|
WO-000000006
|
Enugu
|
ENG-SS-002
|
planned
|
2024-09-14 15:47:52
|
2024-09-17 15:47:52
|
2024-09-17 15:47:52
|
on_hold
| 631,574 |
TEAM-0006
|
WO-000000007
|
Enugu
|
ENG-SS-001
|
planned
|
2024-03-08 00:51:16
|
2024-03-14 00:51:16
|
2024-03-16 00:51:16
|
open
| 3,542,829 |
TEAM-0007
|
WO-000000008
|
Ibadan
|
IBD-SS-001
|
unplanned
|
2024-08-22 21:49:01
|
2024-08-22 21:49:01
|
2024-08-22 21:49:01
|
completed
| 2,984,564 |
TEAM-0008
|
WO-000000009
|
Ikeja
|
IKJ-SS-003
|
unplanned
|
2024-12-17 11:19:35
|
2024-12-17 11:19:35
|
2024-12-17 11:19:35
|
completed
| 2,144,900 |
TEAM-0009
|
WO-000000010
|
Jos
|
JOS-SS-002
|
planned
|
2024-10-13 17:22:55
|
2024-10-16 17:22:55
|
2024-10-21 17:22:55
|
open
| 625,941 |
TEAM-0010
|
WO-000000011
|
Kano
|
KNO-SS-001
|
planned
|
2024-11-29 15:15:41
|
2024-12-06 15:15:41
|
2024-12-07 15:15:41
|
in_progress
| 1,631,273 |
TEAM-0011
|
WO-000000012
|
Abuja
|
ABJ-SS-001
|
planned
|
2024-03-09 13:15:26
|
2024-03-20 13:15:26
|
2024-03-22 13:15:26
|
open
| 2,879,533 |
TEAM-0012
|
WO-000000013
|
Enugu
|
ENG-SS-002
|
unplanned
|
2024-02-10 12:11:52
|
2024-02-11 12:11:52
|
2024-02-11 12:11:52
|
open
| 3,909,927 |
TEAM-0013
|
WO-000000014
|
Ibadan
|
IBD-SS-003
|
unplanned
|
2024-02-01 20:39:01
|
2024-02-01 20:39:01
|
2024-02-01 20:39:01
|
completed
| 1,142,746 |
TEAM-0014
|
WO-000000015
|
Port Harcourt
|
PHC-SS-002
|
planned
|
2024-12-03 18:15:12
|
2024-12-04 18:15:12
|
2024-12-07 18:15:12
|
completed
| 3,608,537 |
TEAM-0015
|
WO-000000016
|
Jos
|
JOS-SS-001
|
unplanned
|
2024-02-08 15:59:29
|
2024-02-10 15:59:29
|
2024-02-10 15:59:29
|
cancelled
| 1,562,229 |
TEAM-0016
|
WO-000000017
|
Ikeja
|
IKJ-SS-001
|
unplanned
|
2024-02-20 15:15:07
|
2024-02-26 15:15:07
|
2024-02-29 15:15:07
|
completed
| 3,693,851 |
TEAM-0017
|
WO-000000018
|
Jos
|
JOS-SS-002
|
planned
|
2024-05-03 11:00:04
|
2024-05-05 11:00:04
|
2024-05-06 11:00:04
|
on_hold
| 2,877,271 |
TEAM-0018
|
WO-000000019
|
Eko
|
EKO-SS-002
|
unplanned
|
2024-12-21 05:22:04
|
2024-12-26 05:22:04
|
2024-12-27 05:22:04
|
open
| 601,247 |
TEAM-0019
|
WO-000000020
|
Jos
|
JOS-SS-002
|
planned
|
2024-03-21 10:32:47
|
2024-03-24 10:32:47
|
2024-03-26 10:32:47
|
in_progress
| 1,114,286 |
TEAM-0020
|
WO-000000021
|
Benin
|
BEN-SS-001
|
planned
|
2024-03-27 17:33:00
|
2024-04-03 17:33:00
|
2024-04-06 17:33:00
|
completed
| 1,579,501 |
TEAM-0021
|
WO-000000022
|
Benin
|
BEN-SS-002
|
planned
|
2024-04-09 16:36:18
|
2024-04-17 16:36:18
|
2024-04-21 16:36:18
|
completed
| 1,452,671 |
TEAM-0022
|
WO-000000023
|
Abuja
|
ABJ-SS-002
|
planned
|
2024-04-10 14:28:00
|
2024-04-11 14:28:00
|
2024-04-15 14:28:00
|
in_progress
| 1,943,660 |
TEAM-0023
|
WO-000000024
|
Enugu
|
ENG-SS-001
|
planned
|
2024-12-14 02:32:07
|
2024-12-19 02:32:07
|
2024-12-19 02:32:07
|
in_progress
| 2,963,568 |
TEAM-0024
|
WO-000000025
|
Benin
|
BEN-SS-001
|
unplanned
|
2024-01-31 07:16:40
|
2024-02-04 07:16:40
|
2024-02-06 07:16:40
|
in_progress
| 1,815,859 |
TEAM-0025
|
WO-000000026
|
Jos
|
JOS-SS-001
|
planned
|
2024-08-21 13:08:16
|
2024-08-29 13:08:16
|
2024-09-01 13:08:16
|
cancelled
| 1,719,035 |
TEAM-0026
|
WO-000000027
|
Abuja
|
ABJ-SS-003
|
planned
|
2024-01-07 11:03:00
|
2024-01-19 11:03:00
|
2024-01-24 11:03:00
|
open
| 1,055,464 |
TEAM-0027
|
WO-000000028
|
Ibadan
|
IBD-SS-002
|
unplanned
|
2024-02-08 04:31:49
|
2024-02-08 04:31:49
|
2024-02-10 04:31:49
|
in_progress
| 4,867,193 |
TEAM-0028
|
WO-000000029
|
Kaduna
|
KAD-SS-001
|
planned
|
2024-12-25 20:04:03
|
2025-01-04 20:04:03
|
2025-01-08 20:04:03
|
open
| 2,012,431 |
TEAM-0029
|
WO-000000030
|
Ibadan
|
IBD-SS-001
|
planned
|
2024-01-19 23:04:23
|
2024-01-25 23:04:23
|
2024-01-26 23:04:23
|
on_hold
| 2,867,966 |
TEAM-0030
|
WO-000000031
|
Eko
|
EKO-SS-002
|
unplanned
|
2024-05-30 06:26:49
|
2024-05-30 06:26:49
|
2024-05-30 06:26:49
|
in_progress
| 479,290 |
TEAM-0031
|
WO-000000032
|
Ikeja
|
IKJ-SS-002
|
planned
|
2024-06-19 13:29:04
|
2024-06-26 13:29:04
|
2024-06-28 13:29:04
|
completed
| 1,134,791 |
TEAM-0032
|
WO-000000033
|
Eko
|
EKO-SS-002
|
planned
|
2024-09-30 21:10:22
|
2024-10-07 21:10:22
|
2024-10-09 21:10:22
|
in_progress
| 7,415,844 |
TEAM-0033
|
WO-000000034
|
Abuja
|
ABJ-SS-002
|
planned
|
2024-07-22 18:05:31
|
2024-07-29 18:05:31
|
2024-07-31 18:05:31
|
open
| 876,683 |
TEAM-0034
|
WO-000000035
|
Eko
|
EKO-SS-001
|
unplanned
|
2024-07-22 11:06:34
|
2024-07-24 11:06:34
|
2024-07-24 11:06:34
|
on_hold
| 3,597,319 |
TEAM-0035
|
WO-000000036
|
Kano
|
KNO-SS-002
|
unplanned
|
2024-09-17 08:49:26
|
2024-09-19 08:49:26
|
2024-09-20 08:49:26
|
in_progress
| 3,491,787 |
TEAM-0036
|
WO-000000037
|
Ikeja
|
IKJ-SS-003
|
planned
|
2024-01-03 20:44:00
|
2024-01-11 20:44:00
|
2024-01-14 20:44:00
|
in_progress
| 1,605,141 |
TEAM-0037
|
WO-000000038
|
Ibadan
|
IBD-SS-001
|
unplanned
|
2024-05-11 04:11:11
|
2024-05-15 04:11:11
|
2024-05-15 04:11:11
|
completed
| 2,818,480 |
TEAM-0038
|
WO-000000039
|
Benin
|
BEN-SS-002
|
unplanned
|
2024-09-06 23:39:39
|
2024-09-06 23:39:39
|
2024-09-06 23:39:39
|
open
| 2,137,843 |
TEAM-0039
|
WO-000000040
|
Abuja
|
ABJ-SS-001
|
planned
|
2024-12-24 18:07:57
|
2024-12-29 18:07:57
|
2025-01-04 18:07:57
|
open
| 2,079,989 |
TEAM-0040
|
WO-000000041
|
Enugu
|
ENG-SS-002
|
planned
|
2024-10-26 13:22:09
|
2024-11-03 13:22:09
|
2024-11-03 13:22:09
|
in_progress
| 1,345,608 |
TEAM-0041
|
WO-000000042
|
Jos
|
JOS-SS-002
|
planned
|
2024-06-17 18:07:25
|
2024-06-25 18:07:25
|
2024-06-30 18:07:25
|
cancelled
| 3,198,464 |
TEAM-0042
|
WO-000000043
|
Kano
|
KNO-SS-002
|
planned
|
2024-05-10 07:31:44
|
2024-05-18 07:31:44
|
2024-05-21 07:31:44
|
on_hold
| 1,317,546 |
TEAM-0043
|
WO-000000044
|
Jos
|
JOS-SS-001
|
planned
|
2024-05-21 20:23:07
|
2024-05-26 20:23:07
|
2024-05-29 20:23:07
|
in_progress
| 1,511,776 |
TEAM-0044
|
WO-000000045
|
Jos
|
JOS-SS-002
|
planned
|
2024-08-02 12:47:00
|
2024-08-12 12:47:00
|
2024-08-16 12:47:00
|
in_progress
| 215,845 |
TEAM-0045
|
WO-000000046
|
Kano
|
KNO-SS-001
|
planned
|
2024-11-13 18:22:04
|
2024-11-15 18:22:04
|
2024-11-18 18:22:04
|
open
| 1,759,875 |
TEAM-0046
|
WO-000000047
|
Port Harcourt
|
PHC-SS-002
|
planned
|
2024-01-02 00:23:39
|
2024-01-09 00:23:39
|
2024-01-12 00:23:39
|
open
| 2,406,547 |
TEAM-0047
|
WO-000000048
|
Abuja
|
ABJ-SS-003
|
unplanned
|
2024-06-14 21:07:05
|
2024-06-17 21:07:05
|
2024-06-17 21:07:05
|
in_progress
| 1,063,032 |
TEAM-0048
|
WO-000000049
|
Eko
|
EKO-SS-002
|
unplanned
|
2024-04-07 11:26:57
|
2024-04-11 11:26:57
|
2024-04-13 11:26:57
|
in_progress
| 737,416 |
TEAM-0049
|
WO-000000050
|
Jos
|
JOS-SS-001
|
planned
|
2024-01-26 05:13:38
|
2024-02-05 05:13:38
|
2024-02-08 05:13:38
|
on_hold
| 829,118 |
TEAM-0050
|
WO-000000051
|
Enugu
|
ENG-SS-002
|
planned
|
2024-07-05 18:07:44
|
2024-07-13 18:07:44
|
2024-07-14 18:07:44
|
open
| 1,972,756 |
TEAM-0051
|
WO-000000052
|
Benin
|
BEN-SS-002
|
planned
|
2024-06-23 19:16:04
|
2024-07-01 19:16:04
|
2024-07-01 19:16:04
|
in_progress
| 2,868,142 |
TEAM-0052
|
WO-000000053
|
Ikeja
|
IKJ-SS-003
|
unplanned
|
2024-11-01 09:29:43
|
2024-11-04 09:29:43
|
2024-11-05 09:29:43
|
in_progress
| 1,039,124 |
TEAM-0053
|
WO-000000054
|
Enugu
|
ENG-SS-001
|
unplanned
|
2024-05-15 08:03:10
|
2024-05-16 08:03:10
|
2024-05-17 08:03:10
|
open
| 691,726 |
TEAM-0054
|
WO-000000055
|
Kano
|
KNO-SS-001
|
planned
|
2024-08-05 09:58:22
|
2024-08-14 09:58:22
|
2024-08-14 09:58:22
|
open
| 1,600,189 |
TEAM-0055
|
WO-000000056
|
Kano
|
KNO-SS-002
|
planned
|
2024-11-12 20:29:03
|
2024-11-17 20:29:03
|
2024-11-21 20:29:03
|
in_progress
| 1,666,573 |
TEAM-0056
|
WO-000000057
|
Abuja
|
ABJ-SS-002
|
unplanned
|
2024-12-10 20:40:43
|
2024-12-10 20:40:43
|
2024-12-11 20:40:43
|
open
| 1,087,542 |
TEAM-0057
|
WO-000000058
|
Ikeja
|
IKJ-SS-002
|
planned
|
2024-08-12 20:41:30
|
2024-08-16 20:41:30
|
2024-08-19 20:41:30
|
in_progress
| 5,839,536 |
TEAM-0058
|
WO-000000059
|
Ikeja
|
IKJ-SS-002
|
planned
|
2024-04-29 10:41:17
|
2024-05-05 10:41:17
|
2024-05-06 10:41:17
|
in_progress
| 5,981,933 |
TEAM-0059
|
WO-000000060
|
Jos
|
JOS-SS-001
|
planned
|
2024-06-13 03:52:51
|
2024-06-19 03:52:51
|
2024-06-24 03:52:51
|
completed
| 2,604,128 |
TEAM-0060
|
WO-000000061
|
Enugu
|
ENG-SS-002
|
unplanned
|
2024-01-16 00:44:04
|
2024-01-17 00:44:04
|
2024-01-17 00:44:04
|
completed
| 1,954,044 |
TEAM-0061
|
WO-000000062
|
Kaduna
|
KAD-SS-002
|
planned
|
2024-02-01 15:08:45
|
2024-02-05 15:08:45
|
2024-02-07 15:08:45
|
completed
| 928,664 |
TEAM-0062
|
WO-000000063
|
Kaduna
|
KAD-SS-002
|
planned
|
2024-11-25 18:39:25
|
2024-12-03 18:39:25
|
2024-12-06 18:39:25
|
on_hold
| 1,043,271 |
TEAM-0063
|
WO-000000064
|
Port Harcourt
|
PHC-SS-001
|
unplanned
|
2024-10-05 16:22:52
|
2024-10-05 16:22:52
|
2024-10-05 16:22:52
|
in_progress
| 3,136,428 |
TEAM-0064
|
WO-000000065
|
Eko
|
EKO-SS-002
|
planned
|
2024-02-28 07:51:07
|
2024-03-03 07:51:07
|
2024-03-06 07:51:07
|
in_progress
| 2,669,465 |
TEAM-0065
|
WO-000000066
|
Kano
|
KNO-SS-001
|
unplanned
|
2024-09-21 19:25:13
|
2024-09-21 19:25:13
|
2024-09-21 19:25:13
|
completed
| 2,652,501 |
TEAM-0066
|
WO-000000067
|
Port Harcourt
|
PHC-SS-002
|
planned
|
2024-05-31 11:27:51
|
2024-06-09 11:27:51
|
2024-06-12 11:27:51
|
completed
| 1,487,728 |
TEAM-0067
|
WO-000000068
|
Kaduna
|
KAD-SS-001
|
planned
|
2024-10-13 11:29:25
|
2024-10-25 11:29:25
|
2024-10-26 11:29:25
|
in_progress
| 1,679,635 |
TEAM-0068
|
WO-000000069
|
Eko
|
EKO-SS-001
|
planned
|
2024-06-19 10:14:14
|
2024-06-27 10:14:14
|
2024-07-02 10:14:14
|
in_progress
| 1,511,465 |
TEAM-0069
|
WO-000000070
|
Port Harcourt
|
PHC-SS-002
|
planned
|
2024-11-16 12:41:40
|
2024-11-22 12:41:40
|
2024-11-25 12:41:40
|
open
| 3,109,218 |
TEAM-0070
|
WO-000000071
|
Abuja
|
ABJ-SS-002
|
unplanned
|
2024-05-06 13:28:56
|
2024-05-08 13:28:56
|
2024-05-11 13:28:56
|
open
| 2,081,031 |
TEAM-0071
|
WO-000000072
|
Ikeja
|
IKJ-SS-002
|
unplanned
|
2024-04-03 08:51:50
|
2024-04-09 08:51:50
|
2024-04-09 08:51:50
|
completed
| 1,777,446 |
TEAM-0072
|
WO-000000073
|
Jos
|
JOS-SS-001
|
unplanned
|
2024-07-15 08:49:59
|
2024-07-15 08:49:59
|
2024-07-15 08:49:59
|
completed
| 855,119 |
TEAM-0073
|
WO-000000074
|
Kano
|
KNO-SS-002
|
planned
|
2024-01-16 22:54:32
|
2024-01-31 22:54:32
|
2024-02-02 22:54:32
|
completed
| 1,058,957 |
TEAM-0074
|
WO-000000075
|
Abuja
|
ABJ-SS-001
|
planned
|
2024-07-08 01:02:49
|
2024-07-15 01:02:49
|
2024-07-19 01:02:49
|
in_progress
| 1,839,640 |
TEAM-0075
|
WO-000000076
|
Ikeja
|
IKJ-SS-003
|
planned
|
2024-05-25 13:51:33
|
2024-06-02 13:51:33
|
2024-06-02 13:51:33
|
open
| 2,674,387 |
TEAM-0076
|
WO-000000077
|
Benin
|
BEN-SS-001
|
unplanned
|
2024-12-27 05:06:24
|
2024-12-27 05:06:24
|
2024-12-27 05:06:24
|
completed
| 1,893,500 |
TEAM-0077
|
WO-000000078
|
Ibadan
|
IBD-SS-002
|
planned
|
2024-12-06 14:04:50
|
2024-12-17 14:04:50
|
2024-12-17 14:04:50
|
completed
| 1,355,835 |
TEAM-0078
|
WO-000000079
|
Port Harcourt
|
PHC-SS-001
|
planned
|
2024-12-07 19:37:36
|
2024-12-13 19:37:36
|
2024-12-17 19:37:36
|
completed
| 1,529,448 |
TEAM-0079
|
WO-000000080
|
Benin
|
BEN-SS-001
|
unplanned
|
2024-10-02 17:32:12
|
2024-10-06 17:32:12
|
2024-10-06 17:32:12
|
open
| 3,356,707 |
TEAM-0080
|
WO-000000081
|
Port Harcourt
|
PHC-SS-001
|
planned
|
2024-07-04 13:40:00
|
2024-07-09 13:40:00
|
2024-07-15 13:40:00
|
in_progress
| 2,216,600 |
TEAM-0081
|
WO-000000082
|
Abuja
|
ABJ-SS-003
|
planned
|
2024-07-05 15:51:44
|
2024-07-12 15:51:44
|
2024-07-12 15:51:44
|
in_progress
| 1,752,863 |
TEAM-0082
|
WO-000000083
|
Benin
|
BEN-SS-001
|
unplanned
|
2024-05-14 04:49:38
|
2024-05-18 04:49:38
|
2024-05-21 04:49:38
|
in_progress
| 1,541,794 |
TEAM-0083
|
WO-000000084
|
Kano
|
KNO-SS-002
|
planned
|
2024-05-29 07:17:43
|
2024-06-10 07:17:43
|
2024-06-13 07:17:43
|
completed
| 1,563,246 |
TEAM-0084
|
WO-000000085
|
Enugu
|
ENG-SS-001
|
unplanned
|
2024-08-17 20:34:36
|
2024-08-17 20:34:36
|
2024-08-17 20:34:36
|
completed
| 1,826,140 |
TEAM-0085
|
WO-000000086
|
Kano
|
KNO-SS-002
|
unplanned
|
2024-03-06 00:16:17
|
2024-03-08 00:16:17
|
2024-03-09 00:16:17
|
open
| 2,530,978 |
TEAM-0086
|
WO-000000087
|
Benin
|
BEN-SS-002
|
planned
|
2024-06-17 14:36:43
|
2024-06-18 14:36:43
|
2024-06-20 14:36:43
|
in_progress
| 2,415,185 |
TEAM-0087
|
WO-000000088
|
Eko
|
EKO-SS-001
|
planned
|
2024-07-27 15:36:16
|
2024-07-31 15:36:16
|
2024-08-02 15:36:16
|
completed
| 3,403,284 |
TEAM-0088
|
WO-000000089
|
Ikeja
|
IKJ-SS-001
|
planned
|
2024-08-03 08:38:36
|
2024-08-05 08:38:36
|
2024-08-08 08:38:36
|
open
| 5,408,917 |
TEAM-0089
|
WO-000000090
|
Kano
|
KNO-SS-002
|
planned
|
2024-08-06 16:10:47
|
2024-08-06 16:10:47
|
2024-08-10 16:10:47
|
open
| 1,538,376 |
TEAM-0090
|
WO-000000091
|
Jos
|
JOS-SS-001
|
unplanned
|
2024-12-07 12:10:53
|
2024-12-09 12:10:53
|
2024-12-09 12:10:53
|
completed
| 3,892,533 |
TEAM-0091
|
WO-000000092
|
Jos
|
JOS-SS-002
|
planned
|
2024-05-16 06:56:07
|
2024-05-23 06:56:07
|
2024-05-24 06:56:07
|
open
| 3,042,337 |
TEAM-0092
|
WO-000000093
|
Enugu
|
ENG-SS-001
|
planned
|
2024-11-16 03:19:54
|
2024-11-23 03:19:54
|
2024-11-27 03:19:54
|
open
| 1,612,557 |
TEAM-0093
|
WO-000000094
|
Enugu
|
ENG-SS-002
|
unplanned
|
2024-01-08 19:27:09
|
2024-01-08 19:27:09
|
2024-01-08 19:27:09
|
open
| 962,345 |
TEAM-0094
|
WO-000000095
|
Port Harcourt
|
PHC-SS-001
|
planned
|
2024-04-28 09:04:30
|
2024-05-04 09:04:30
|
2024-05-06 09:04:30
|
in_progress
| 1,396,415 |
TEAM-0095
|
WO-000000096
|
Abuja
|
ABJ-SS-003
|
planned
|
2024-01-06 08:38:50
|
2024-01-08 08:38:50
|
2024-01-09 08:38:50
|
completed
| 1,927,046 |
TEAM-0096
|
WO-000000097
|
Kano
|
KNO-SS-001
|
planned
|
2024-01-03 08:35:16
|
2024-01-10 08:35:16
|
2024-01-15 08:35:16
|
on_hold
| 2,362,806 |
TEAM-0097
|
WO-000000098
|
Port Harcourt
|
PHC-SS-002
|
unplanned
|
2024-07-11 01:37:33
|
2024-07-12 01:37:33
|
2024-07-13 01:37:33
|
in_progress
| 1,015,116 |
TEAM-0098
|
WO-000000099
|
Kano
|
KNO-SS-002
|
planned
|
2024-11-20 16:38:26
|
2024-11-26 16:38:26
|
2024-11-27 16:38:26
|
in_progress
| 1,871,811 |
TEAM-0099
|
# Nigerian Energy & Utilities – Work Orders
Planned/unplanned work orders with timelines, status, costs, and assigned teams.
- **[category]** Maintenance & Operations
- **[rows]** ~80,000
- **[formats]** CSV + Parquet (snappy)
- **[geography]** Nigeria (DisCos, substations, plants)
## Schema
| column | dtype |
|---|---| | wo_id | object | | disco | object | | substation_id | object | | category | object | | created_time | object | | planned_start | object | | planned_end | object | | status | object | | estimated_cost_ngn | float64 | | assigned_team | object |
## Usage
```python
import pandas as pd
df = pd.read_parquet('data/nigerian_energy_and_utilities_work_orders/nigerian_energy_and_utilities_work_orders.parquet')
df.head()
```
```python
from datasets import load_dataset
ds = load_dataset('electricsheepafrica/nigerian_energy_and_utilities_work_orders')
ds
```
## Notes
- Data generated with Nigeria-specific parameters (DisCos, tariff bands, 50 Hz grid)
- Time-of-use shapes and seasonal/weather effects included where applicable
- Values are internally consistent (e.g., kWh ~ kW*h; voltage/current ~ power)